Thank you for visiting Bartle & Gibson. If you encounter any issues or have feedback to share, please email us at [email protected]. Your input is greatly appreciated!
content loaded
HEATLINK 22191 AQUALINK 3/4 FIP SUPPLY END CONNECTION
MFR Part #: 22191
SKU #: 1007351
Brand: HeatLink®
UPC: 400001878439
Please note this item is discontinued (order fulfillment will depend on stock availability): HeatLink® 22191 Connector, 3/4 in FNPT
Product Details
Attributes
Features
Resources
HeatLink® Connector, Connector Fitting, 3/4 in Connection Size 1, Connection Type 1: FNPT, FNPT Connection
Clearance Items:
Clearance
Connection Type:
FNPT
Connection Size 1:
3/4 in
Connection Type 1:
FNPT
Fitting Type:
Connector
Use silicone lubricant (#79951 or #79952) to lubricate dry O-rings to ensure a tight seal
In case a leak develops during testing, remove pressure from system, clean the O-ring and reapply silicone lube
When placing the manifold into the supporting bracket, place the bottom snap-in lock in the bottom (braced) notch in bracket and then rotate it so that the top snaps into place
In order to prevent stress on the manifold supply end connections, the supply piping must be braced or supported, parallel to the manifold and centered with the manifold's inlets
Do not use EasyFit™ manifolds and accessories for purposes other than those for which they were designed, do not exceed their specifications
Failure to follow these guidelines or the products instructions will void the warranty
Consult with your EasyFit™ dealer or distributor if you have any questions regarding the operations and limits of HeatLink® products
Review all instructions and warranty information carefully
HeatLink® Connector, Connector Fitting, 3/4 in Connection Size 1, Connection Type 1: FNPT, FNPT Connection
Attributes
Clearance Items: Clearance
Connection Type: FNPT
Connection Size 1: 3/4 in
Connection Type 1: FNPT
Fitting Type: Connector
Features
Use silicone lubricant (#79951 or #79952) to lubricate dry O-rings to ensure a tight seal
In case a leak develops during testing, remove pressure from system, clean the O-ring and reapply silicone lube
When placing the manifold into the supporting bracket, place the bottom snap-in lock in the bottom (braced) notch in bracket and then rotate it so that the top snaps into place
In order to prevent stress on the manifold supply end connections, the supply piping must be braced or supported, parallel to the manifold and centered with the manifold's inlets
Do not use EasyFit™ manifolds and accessories for purposes other than those for which they were designed, do not exceed their specifications
Failure to follow these guidelines or the products instructions will void the warranty
Consult with your EasyFit™ dealer or distributor if you have any questions regarding the operations and limits of HeatLink® products
Review all instructions and warranty information carefully